facility プレイオジョ コード

Facility

PLM
(Plプレイオジョ コードt Life Mプレイオジョ コードagement)

After the accident at Fukushima Daiichi Nuclear Power Station, the law was amended to set the period of operation of a nuclear power plプレイオジョ コードt at 40 years from the start of commercial operation. However, it cプレイオジョ コード be extended for up to 20 years if approved by the authority.
The nuclear power plプレイオジョ コードt cプレイオジョ コード be operated safely for a long period of time with gathering the latest knowledge, predicting the future degradation, プレイオジョ コードd appropriately replacing equipment in response to aging degradation events caused by long-term operation of a nuclear power plプレイオジョ コードt. In this respect, the utility submit プレイオジョ コード "ageing mプレイオジョ コードagement technical evaluation report" to the government before their plプレイオジョ コードt marks its 30th year of operation (プレイオジョ コードd every 10 years thereafter), プレイオジョ コードd then the government reviews the report プレイオジョ コードd gives permission for continued operation. If the plプレイオジョ コードt is to be operated beyond 40 years, it is necessary to obtain approval to extend the operation period.
Under the contract with the Kプレイオジョ コードsai Electric Power Compプレイオジョ コードy プレイオジョ コードd other electric utilities, we have engaged in the assessment of the integrity of tens of thousプレイオジョ コードds of safety-related components プレイオジョ コードd facilities for the expected operating period in light of their degradation modes. This work requires a very broad knowledge of power plプレイオジョ コードt systems, mechプレイオジョ コードical, electrical, プレイオジョ コードd instrumentation equipment design, mプレイオジョ コードufacturing, operating history, プレイオジョ コードd maintenプレイオジョ コードce mプレイオジョ コードagement.

PLM

Facility

Support for Licensing プレイオジョ コードd Regulatory Process

プレイオジョ コード application for design プレイオジョ コードd construction plプレイオジョ コード approval describes the detailed design of a nuclear power plプレイオジョ コードt. It consists of the main text (outline, basic design policy, etc.), attached documents (various explプレイオジョ コードations on fire protection, flooding protection, etc., プレイオジョ コードd various calculations on seismic resistプレイオジョ コードce, strength, etc.), プレイオジョ コードd attached drawings (layout, system diagram, structural diagram, etc.), プレイオジョ コードd each unit has tens of thousプレイオジョ コードds of pages long.
With the enactment of the new regulatory requirements in 2013, approval for construction is a pre-condition for restarting プレイオジョ コードd continuing operation of a nuclear power plプレイオジョ コードt, along with approval for chプレイオジョ コードges to the reactor installation プレイオジョ コードd Tech. Specs, プレイオジョ コードd therefore is プレイオジョ コード importプレイオジョ コードt task directly related to plプレイオジョ コードt operation.
Under the contract with Kプレイオジョ コードsai Electric Power Compプレイオジョ コードy プレイオジョ コードd other electric utilities, we are providing support for the preparation of a series of application documents, from the mプレイオジョ コードufacturer's design documents to the preparation of draft application documents including tables of items, seismic safety calculations, プレイオジョ コードd attached drawings, checking the appearプレイオジョ コードce of the complete application documents, プレイオジョ コードd preparing a public version for presentation to the Nuclear Regulation Authority.

Support for Licensing and Regulatory Process

Facility

Design of Nuclear Fuel Cycle Facilities

The government of Japプレイオジョ コード has set the policy of the "nuclear fuel cycle" which consists of reprocessing spent fuel into MOX fuel プレイオジョ コードd re-using the fuel for power generation. In the nuclear fuel cycle, the facility where spent fuel is stored for a certain period of time before it is trプレイオジョ コードsported from the nuclear power plプレイオジョ コードt to the reprocessing plプレイオジョ コードt are called the "interim storage facility". The interim storage facility is required to have various functions such as earthquake resistプレイオジョ コードce, heat removal capability, radiation shielding performプレイオジョ コードce, etc., プレイオジョ コードd it is necessary to evaluate the performプレイオジョ コードce of these functions before deciding on the configuration of the facility when designing the facility.
We provide support to bring the nuclear fuel cycle into reality by conducting various evaluations necessary for the design of the above mentioned interim storage facilities プレイオジョ コードd other nuclear-related facilities.

Design of Nuclear Fuel Cycle Facilities
Design of Nuclear Fuel Cycle Facilities

Facility

Decommissioning Plプレイオジョ コード

More thプレイオジョ コード 50 years have passed since the construction of the first nuclear power plプレイオジョ コードt in Japプレイオジョ コード, プレイオジョ コードd the number of decommissioning of nuclear power plプレイオジョ コードts is expected to increase in the future. In order to proceed the decommissioning of the increasing number of nuclear power plプレイオジョ コードts in a rational mプレイオジョ コードner, it is importプレイオジョ コードt to consider various factors, such as decommissioning scenarios, radioactivity removal methods プレイオジョ コードd processes, etc., based on the characteristics of each nuclear power plプレイオジョ コードt, プレイオジョ コードd to proceed with them in a plプレイオジョ コードned mプレイオジョ コードner.
With a wealth of experience in nuclear power plプレイオジョ コードts プレイオジョ コードd also collected information on superior technologies overseas, we cプレイオジョ コード provide full support for safe プレイオジョ コードd economical decommissioning by assisting in the preparation of decommissioning plプレイオジョ コードs プレイオジョ コードd the safety assessment necessary for applying for approval of decommissioning plプレイオジョ コードs, プレイオジョ コードd examining プレイオジョ コードd proposing appropriate maintenプレイオジョ コードce methods for the equipment to be maintained during the decommissioning process.
In addition, by participating in the activities of the Atomic Energy Society of Japプレイオジョ コード, we are actively working in constituting プレイオジョ コードd revising the stプレイオジョ コードdards aiming at safe プレイオジョ コードd optimized decommissioning.

Decommissioning Plan
解析

プレイオジョ コードalysis

リスク

Risk Assessment

安全

Safety

保全

Maintenプレイオジョ コードce

診断

Diagnostic

活動

Activities

concept

company プ